Backend, Data & Security More detail C · Industry convention Platform: Web

Request Deadline

A request deadline is the time after which a client stops waiting. Each downstream call should receive only the time that remains.

See how it works
You might call it deadline propagationrequest time limitRPC deadline

See how it works

Original worked exampleRequest Deadline
State & recoveryRequest Deadlineabsolute deadline -> remaining timeout -> propagate -> cancel -> stop spawned work
CHECKOUT REQUEST800 ms
CLIENT → APIDeadline set13:00:00.800
API → INVENTORY180 ms already used620 ms left
Time reaches zeroCANCEL
KEEP SAFEEvery downstream call receives only the remaining time.RECOVERAfter cancellation, the app stops spawned work and releases resources.
absolute deadline -> remaining timeout -> propagate -> cancel -> stop spawned workSRE
Request DeadlineService resilience

Another example

Checkout starts with 800 ms. The API gives inventory the remaining 620 ms. The call is cancelled at zero. The server then stops its spawned work.

Main parts

  1. 01Start time
  2. 02Absolute deadline
  3. 03Elapsed time
  4. 04Remaining time
  5. 05Cancellation signal
  6. 06Cleanup path

Use it when

Set a deadline on remote calls. Choose it from user needs and measured latency. Pass the remaining time through the call chain.

Do not use it when

Do not pick a tiny number without data. Stopping the wait is not enough. Servers must also notice cancellation and stop work.

Name used in code

absolute deadline -> remaining timeout -> propagate -> cancel -> stop spawned work

Before you ship

Check contracts and invariants, authorization, and input limits. Test retries, one-time effects, timeouts, and partial failures. Verify data integrity, compatibility, monitoring, recovery, and rollback.

Request you can copy

Outcome: Design or review Request Deadline for this system while keeping data correct, secure, and easy to operate. User context: Checkout starts with 800 ms. The API gives inventory the remaining 620 ms. The call is cancelled at zero. The server then stops its spawned work. Technical concept or control: Request Deadline. Why it fits: Set a deadline on remote calls. Choose it from user needs and measured latency. Pass the remaining time through the call chain. Do not use it when: Do not pick a tiny number without data. Stopping the wait is not enough. Servers must also notice cancellation and stop work. Engineering requirements: Define inputs, outputs, contracts, and rules that must always hold. Set authorization and input checks. Define failures, timeouts, retries, one-time effects, data moves, and compatibility limits. Operations: Add useful signals and logs that hide sensitive data. Set capacity limits and write an operator guide. Test recovery and rollback. Acceptance criteria: Contract and failure-path tests pass. Data and authorization rules still hold during retries and partial failures. Check performance limits, monitoring, recovery, and rollback. Evidence and limits (evidence boundary): No single official standard controls the whole term. Its meaning may change across teams, platforms, or frameworks. Unknowns to confirm: Where the code runs, data stores, traffic shape, consistency needs, and the security boundary. Also confirm the compatibility period, service goals, and rollback limits.

Check this request

Review the current use of Request Deadline. Definition: A request deadline is the time after which a client stops waiting. Each downstream call should receive only the time that remains. Release checks: Check contracts and invariants, authorization, and input limits. Test retries, one-time effects, timeouts, and partial failures. Verify data integrity, compatibility, monitoring, recovery, and rollback. Before changing code, report the evidence you found, gaps, severity, and the smallest safe fix.

C
How official is this term?

Industry convention

People often use this term at work. The listed sources may support practice or limitations. They do not define every part of the term.

No single official standard controls the whole term. Its meaning may change across teams, platforms, or frameworks.

Scope
Cross-platform request-deadline convention; gRPC defines its own deadline and propagation behavior
Document status
stable
Checked on
2026-07-30

Evidence sources & scope

Authority source + Term reference · gRPC · stable Deadlines Scope: gRPC client deadlines, server cancellation, and language-dependent deadline propagation; not a rule for every protocol or runtime Role here: Direct term reference Source covers: canonical name, definition, semantics, platform API, implementation, usage guidance, avoidance guidance

Copy it yourself

The browser could not copy this. Select the request below and copy it yourself.